08/11/2026
Nobody drives over this and thinks about the day it went in the ground. That's the job. Infrastructure only gets noticed when it fails so we make sure it doesn't.
Precast box culvert, set and seated. ποΈ
π Need a lift plan? Link in bio.
08/07/2026
Somebody's house, 40 feet in the air, and it lands within a quarter inch. That's not luck that's rigging, planning, and an operator who's done this a thousand times.
Modular set, done clean. βοΈπ
π Booking lifts now link in bio.
06/05/2026
We didn't build Express Crane to be average.
Full jib, both sections, offset 5,600 lbs at 151ft. Another HVAC unit set. Another job done right.
The standard we hold ourselves to is the reason clients keep calling back. ποΈ
06/01/2026
Not every lift is created equal. This Carrier chiller wasn't moving without a 12-point pick, 55ft radius, and a crew that knows exactly what they're doing. 19,000 lbs handled. πͺ
05/21/2026
Some lifts you measure in tons. This one you measure in inches.
Setting at Elliott T. Bowers Stadium took the right boom, the right rigging, and an operator who knows that "close enough" doesn't cut it on a stadium facade.
When the margin for error is zero, call the crew that's been doing it right.
05/14/2026
Not every crane company touches a 255ft tower stack. We do. Night shifts, high-consequence lifts, zero room for error.
Calculated. Not Guesstimated. Built to fit your lift and your budget.
Express Crane & Rigging
05/01/2026
11pm. Most people are home. We're 200 feet in the air.
We built this company because nobody else wanted the calls that came in after dark, on weekends, on the jobs the other guys passed on.
Now those are the jobs we're known for.
If it needs to go up β we put it up. Day, night, doesn't matter.
ECI Express Crane. ποΈ