27/08/2026
ππ equipment is going in TODAY π
Get ready to come see us when doors open 5th Sept!
Last of the early bird rates are going now ππ»ββοΈπββοΈ
Your Fitness Freedom starts at Jetts Joyner with 24/7 access and no lock-in contracts.
27/08/2026
ππ equipment is going in TODAY π
Get ready to come see us when doors open 5th Sept!
Last of the early bird rates are going now ππ»ββοΈπββοΈ
IT IS FINALLY HAPPENING! π¨π₯
We. Can. Not. Wait.
The countdown is officially on! Our doors will swing open on September 5th! Everything weβve been building is all dialled in and waiting for you.
This is your new home for heavy lifts, fresh starts, and crushing goals. We are bringing the energy, and we are ready to see what we can do together.
Mark the calendar, tag your gym partner, and get your gear ready. WE CANNOT WAIT TO SEE YOU THERE! Letβs go! π₯πͺ
Laying the groundwork for your next PR! π§±π¨
The premium flooring is officially going in, and the space is finally starting to look like the ultimate training zone. We didn't cut any corners hereβour new floors are designed for maximum performance and safety:
ποΈββοΈ Heavy-duty impact absorption: Drop those weights with confidence.
π Maximum grip & stability: A solid foundation for every squat, sprint, and lift.
β¨ Clean & seamless design: Looking sharp and ready for action.
The vision is coming to life step by step (literally). What is the first movement you are doing on the new floor? Let us know below! π
Lockers and hydration station: LOADINGβ¦ β³π§
We want your visits smoother, safer, and more refreshing. Here is a sneak peek at what is coming your way:
π§₯ Tall bays: Hang your gear and say goodbye to wrinkled clothes.
π Extra-wide bays: Finally, plenty of room for those oversized gym bags.
π· 24/7 surveillance: Total peace of mind while you put in the work.
π§ Cold filtered water: Crisp, refreshing hydration on tap whenever you need it.
The finishing touches are happening now. Link in BIO!
The mirrors are going in. And weβre getting close to opening the doors! πͺποΈββοΈ
We can already picture the workouts, the good vibes and the community thatβs going to fill this space. πͺπΌβ¨
π Jetts Joyner β opening soon
This is going to be GOOD. ππΌ
07/08/2026
The Joyner Central Coles Opening is today and we'll be down on site too!
We'll be here until 2.00pm today - come have a peek. We can't wait to open our doors officially soon!
π In case you missed it - we are set to open 5th September! π Some of the team will be on site at the Coles Grand Opening down at Joyner Central this Saturday. πβ¨ Come visit us and have a sticky beak! π We'd love to show you what is coming! ππ
The backbone is up. β¨
We were on site last week - Frames are in place and the ceiling is painted. The new Jetts Joyner is taking shape! π§πͺ
Building the dream, one brick at a time. π§±π οΈ
We caught up with the man making it all happen! In todayβs behind-the-scenes update, our head builder talks through the progress weβve made this week and what it takes to construct a facility built for serious training.
From laying down the reinforced flooring for the heavy lifting zones to framing out the new amenities, the bones of this place are officially coming together. We can already hear the weights clanking!
Drop a ποΈ in the comments if youβre ready to see the final reveal!
π Don't forget to hit the link in our bio to lock in your best rate before we open.
Building the dream, one brick at a time. π§±π οΈ
We caught up with the man making it all happen! In todayβs behind-the-scenes update, our head builder talks through the progress weβve made this week and what it takes to construct a facility built for serious training.
From laying down the reinforced flooring for the heavy lifting zones to framing out the new amenities, the bones of this place are officially coming together. We can already hear the weights clanking!
Drop a ποΈ in the comments if youβre ready to see the final reveal!
π Don't forget to hit the link in our bio to lock in your best rate before we open.