11/09/2026
Void area.
BUILDING AND CIVIL ENGINEERING CONTRACTOR. ARCHITECTURAL, STRUCTURAL,MECHANICAL & ELECTRICAL DRAWINGS. Auto CAD TRAINING & SERVICES. WE DESIGN WE BUILD.
We design and build the Comfortable Homes for our clients.
11/09/2026
Void area.
11/09/2026
After this stage, what is the next stage?
11/09/2026
Nice top level.
11/09/2026
Good job
11/09/2026
Beautiful Block work levelling.
11/09/2026
First floor Final height before pent house beams.
Final level before pent house.
10/09/2026
Septic Tank precautions.
17) After casting, the side should be backfilled.
Note: Good mixture must be used for plastering the interior septic tank and casting the top deck.
10/09/2026
Septic Tank precautions.
16) During excavation it's good enough allowance is given so that meson can work around the tank. It helps Meson rub the block very well.
10/09/2026
Septic Tank precautions.
15) The final height of septic tank top cover depends on your agreement with the client.
Some clients may want the top cover hidden while some want it flat with height of landscaping.
| Monday | 08:00 - 18:00 |
| Tuesday | 08:00 - 18:00 |
| Wednesday | 08:00 - 18:00 |
| Thursday | 08:00 - 18:00 |
| Friday | 08:00 - 18:00 |
| Saturday | 08:00 - 18:00 |