Mechmar Boilers

Mechmar Boilers

Share

Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Mechmar Boilers, Level 2, Wisma Dharma , No 1 Jalan Peunding U1/17 Hicom Glenmarie Industrial Park, Shah Alam.

Mechmar Boilers | Industry Leader
πŸ”Ή Experts in Industrial Steam Boilers & Heaters
πŸ”Ή Waste Heat Recovery & Biomass Power Solutions
πŸ”Ή Energy Efficiency with Economizers & Custom Services
πŸ“ Selangor, Malaysia | Est. 1977

28/08/2026

Bukan boiler sahaja. Kepakaran pemeriksaan kami lebih luas. πŸ”

Kali ini, pasukan Mechmar menjalankan pemeriksaan Hot Water Boiler Mechmar, bersama pemeriksaan oleh pihak **JKKP** bagi beberapa jentera di tapak pelanggan.

Selain boiler, kami turut menyediakan perkhidmatan pemeriksaan untuk pelbagai jentera dan peralatan yang berkaitan dengan PMD, PMT dan PMA, termasuk:

βœ… Vessel
βœ… Oil Hose
βœ… Mobile Crane
βœ… Dan pelbagai jentera lain

Satu pasukan, pelbagai keperluan pemeriksaan.

Perlukan sokongan untuk pemeriksaan atau servis peralatan di tapak anda?

πŸ“© [email protected]

Photos from Mechmar Boilers's post 27/08/2026

Reliable steam. Built for performance. πŸ”₯

When your operation depends on consistent steam, your boiler needs to deliver β€” day after day.

Meet the TITAN AS Package Steam Boiler by Mechmar, designed with:
βš™οΈ Efficient heat transfer
πŸ”₯ High combustion efficiency
πŸ”„ Automated operation
πŸ› οΈ Easy access & maintenance
β›½ Flexible fuel options, including biogas

Built to support demanding industrial operations with reliable steam generation and practical maintenance in mind.

πŸ“© Looking for the right steam boiler for your operation?
Talk to Mechmar Boilers today.

πŸ“§ [email protected]
πŸ“² Call / WhatsApp: +60 18-281 1234
🌐 mechmar.com.my

γ‚šviralγ‚·fypγ‚·γ‚šviralγ‚·alγ‚·

26/08/2026

Welding with Precision, Built with Quality πŸ”§βœ¨

Bagaimana Mechmar Memastikan Kualiti Welding Sentiasa Terjaga?

24/08/2026

Dari bilik kuliah ke dunia industri! πŸ‘·β€β™‚οΈπŸ”₯

Minggu lepas, Mechmar Boilers berbesar hati menerima kunjungan Kolej Vokasional Sultan Ahmad Shah, Rompin ke kilang kami di Pasir Gudang.

Para pelajar berpeluang melihat sendiri proses kimpalan, fabrikasi, pembuatan boiler dan amalan keselamatan dalam suasana industri sebenar.

Semoga pengalaman ini memberi inspirasi dan pendedahan bermakna kepada generasi TVET masa depan. βš™οΈβœ¨

Terima kasih atas kunjungan dan kepercayaan kepada Mechmar Boilers!

21/08/2026

Boiler anda sedia untuk pemeriksaan ? πŸ”

Pemeriksaan JKKP penting untuk memastikan boiler beroperasi dengan selamat serta mematuhi keperluan dan piawaian yang ditetapkan.

Di Mechmar, kami bukan sahaja membantu pelanggan dalam pemeriksaan JKKP, malah menyediakan sokongan menyeluruh untuk memastikan boiler kekal dalam keadaan baik dan boleh dipercayai.

Antara perkhidmatan kami:
βœ… Pemeriksaan JKKP
βœ… Servis & penyelenggaraan boiler
βœ… Kalibrasi peralatan
βœ… Repair & troubleshooting
βœ… Penggantian alat ganti

Daripada pemeriksaan hingga pembaikan β€” Mechmar sedia menyokong operasi boiler anda.

πŸ“© Perlukan bantuan untuk boiler anda?
[email protected]

20/08/2026

🀝 CORE VALUE CHAMPION | WE’RE IN IT TOGETHER

Great things happen when we work as one team and support one another.πŸ’™

Congratulations to our Technical & Design Team for being recognised as our Core Value Champion – We’re In It Together!πŸ†

From sharing knowledge to lending a hand when it matters, your teamwork shows what it truly means to be in it together.

Keep supporting. Keep sharing. Keep growing. πŸš€

Congratulations, Team! πŸŽ‰

20/08/2026

πŸ† CORE VALUE CHAMPION | SOLUTION DRIVEN

30 years of experience. Countless challenges. And always, a solution-driven mindset. πŸ’ͺ

The Mechmar Pasir Gudang Factory Team proudly celebrates Noor Ahmad Husini as our Core Value Champion – Solution Driven! πŸ‘

Thank you for your dedication, craftsmanship and perseverance over the years. Your experience continues to inspire the team and make a difference in every project.

Congratulations, En. Noor! πŸŽ‰

Here’s to 30 years of craftsmanship and a legacy that lives on. βš™οΈπŸ”₯

20/08/2026

Celebrating 69 years of independence, unity and the spirit of Malaysia.

From all of us at Mechmar Boilers, Selamat Menyambut Hari Kebangsaan ke-69! β€οΈπŸ€πŸ’™πŸ’›

Malaysia MADANI, Jiwa Merdeka.

Photos from Mechmar Boilers's post 19/08/2026

We came with a booth. We left with an award. πŸ†

On 18 August, Mechmar joined the Hershey Energy Roadshow 2026 in Senai, where vendors came together to engage Hershey employees on energy, efficiency and sustainability.

We wanted our booth to be more than just product displays.

So, we created a space to learn, play and talk about energy.

Visitors explored our SteamBytes and Economiser solutions, while our team shared insights on boiler efficiency and energy optimisation.

Then came the fun. 🎯

The Hand Hopscotch Challenge and Energy Word Search kept visitors engaged, while our Merdeka Photo Contest brought even more interaction. πŸ“Έ

The result?

~200 visitors engaged with our booth β€” and we completely ran out of giveaways.

But the biggest highlight came at the end:

πŸ† Mechmar won the Sustainability Award β€” voted by Hershey staff.

For us, sustainability means helping industries use energy more efficiently, reduce energy waste and explore more sustainable solutions.

Being recognised for this by the very people we engaged with made the award even more meaningful.

Thank you, Hershey, for having us β€” and thank you to everyone who stopped by, played, asked questions and connected with the Mechmar team.

Sometimes, the best conversations about energy start with a little bit of fun. ⚑

14/08/2026

No leak. No pressure drop. Confidence before the next test.

An internal hydrotest was carried out at 23.8 bar following the repair of the feed nozzle block.

Inspection confirmed:
βœ“ No leakage at the repaired feed nozzle block
βœ“ No leakage detected on the boiler tubes
βœ“ Boiler condition found satisfactory
With the internal hydrotest successfully completed, the boiler is now ready for the external hydrotest with the appointed inspection body.

At Mechmar, every repair is followed by proper testing and verification β€” because reliable boiler operation starts with getting the details right.

πŸ“© Need boiler repair, inspection or maintenance support?
[email protected]

Want your business to be the top-listed Gym/sports Facility in Shah Alam?

Click here to claim your Sponsored Listing.

Location

Telephone

Address

Level 2, Wisma Dharma , No 1 Jalan Peunding U1/17 Hicom Glenmarie Industrial Park
Shah Alam
40150

Opening Hours

Monday 08:00 - 17:30
Tuesday 08:30 - 17:00
Wednesday 08:30 - 17:00
Thursday 08:30 - 17:30
Friday 08:30 - 17:30