09/07/2026
⚡️FROM OARS TO APPLAUSE ⚡️
From Henley Royal Regatta to Henley Festival in just 89 hours. 🚣🏻♀️ ➡️ 🎪
A huge amount of infrastructure came out, and an entirely new site came to life.
A Big Top. A Spiegeltent. A floating stage on the Thames complete with full production, video, lighting and sound. A brand new auditorium. Miles of cabling. Countless hours of planning and teamwork.
It’s an incredible transformation, and we’re proud to have played our part in powering it.
A huge well done to our entire team for another exceptional delivery. Now it’s time for Henley Festival to take centre stage. ⚡️
08/06/2026
🔋⚡️FULLY CHARGED ⚡️🔋
Figure of Eight Events has heavily invested in the latest generation of Instagrid One units and Link 36 battery packs, expanding our ability to provide flexible, resilient power solutions on site.
From emergency lighting and backup power systems to tool power, remote site supplies and bespoke applications, these units can be adapted to suit a wide range of operational requirements.
Combined with our existing contactor distribution systems, they can also provide automatic support for emergency lighting and temporary lighting during build and break periods in the unlikely event of a power interruption.
Whether it’s a structure requiring emergency backup, a welfare cabin in a remote location or a unique site-specific challenge, we can tailor a solution to suit.
Need battery power? Consider us your power bank.⚡️🔋
01/06/2026
💡LIGHT WORK💡
Providing power for major sporting events and broadcast environments wherever they are needed.⚡️
When the sun clocks off, we clock on. 🌙
Need dependable power for your stadium? Let us make light work of it! ⚡️
29/05/2026
🏁⚡️FULL POWER. NO PIT STOPS. ⚡️🏁
From Monaco to muddy fields, we’re always ready to go the distance.
Need event power? Put your project in pole position. ⚡️
26/05/2026
☀️⚡️HYDR8 NOW, THANK US L8R⚡️☀️
When the pressure’s on and the temperatures are rising, reliable power and plenty of water are non-negotiable!
Keeping our sites powered and our teams hydr8ed through the heatwave! 💧⚡️
21/05/2026
FIGURE OF EIGHT DON’T HAVE BIGGER GENERAT….😳
1MW of BGG fusteq whisper syncronised power generation with associated 12000L external fuel tank capacity, cabling and 1600A panel. Also featuring real time and recorded data monitoring on both DSE Webnett and on every powerlock feed through our power monitoring software. All from stock, on time and puuuring away silently.
Need big power?…Socket to us 💪
15/05/2026
Great day for a site visit at one of our favourites today 🐎
28/04/2026
⚡️STRAIGHT INTO THE ACTION⚡️
We’re pleased to have Gabi and Archie joining us from the Royal Welsh College of Music and Drama - they’ll be on placement with us for the next 6 weeks.
They’ll be getting stuck into prepping and delivering two of our biggest events of the year - right in the thick of it from day one!
Always great to support and work alongside those starting out in the industry. ✨